Agricultural · farms, yards and grain stores
A farm electrician who tests every building to Section 705.
Cattle sheds, grain stores, workshops and poultry houses all wear wiring out faster than a house does. I wire and inspect them across the Wolds and Holderness.
- £2m public liability insurance
- Work carried out to BS 7671:2018+A4:2026
- Fire alarm design, installation and commissioning to BS 5839-1
What Section 705 asks of a farm
BS 7671, the national wiring standard, has a section for agricultural and horticultural premises. Section 705 covers the fixed wiring inside and outside farm buildings, from the cattle shed to the yard lights and the glasshouse.
Farm buildings are hard on electrics. Washdown water gets into fittings, dust settles on everything, ammonia corrodes metal and rats chew cable. NFU Mutual's latest farm fires report names electrical faults among the main known causes of fires on farms, with arson and lightning.
So the section asks more of a farm installation than of a house. Equipment has to keep out dust and water, circuits need RCD protection, cables are guarded against vehicles and vermin, and where animals are kept the metalwork they can touch is bonded together.
The farmhouse is different. Section 705 leaves rooms used as a home to the general rules, so the farmhouse gets a domestic condition report and the sheds are inspected to Section 705, on the same visit if you like.
Inspections and the report your insurer asks for
The IET's guidance on periodic inspection recommends a shorter gap between inspections on agricultural premises than on homes or offices, and an insurer may set its own interval. The Electricity at Work Regulations apply to a farmer working alone as much as to one with staff.
I carry out a Section 705 inspection of each building, testing the circuits on its board one by one. Every report has an insurer-ready summary at the front, and remedial work is priced in writing.
I'll never push a job on to you. If I think something wants doing I'll tell you and price it, because the last thing I want is you paying for a job now and needing me again six months down the line to rectify it.
Three-phase power for grain stores and dryers
Dryers and heavy machines often need a three-phase supply to a grain store or workshop. The network operator brings it to your meter position, and from there the wiring is mine, with the main switch, the distribution board, armoured cable across the yard and a lockable isolator at each machine.
Settled grain dust can burn, and dust thrown into the air can explode. A grain store needs assessing under DSEAR, the dangerous substances regulations, and the HSE recommends dust-protected lights and fans up at roof level.
Livestock and poultry sheds
Wiring in livestock and poultry sheds has to put up with washdown and ammonia, and stay safe for animals standing on wet concrete beside steel pens. I check the bonding of that steelwork on every inspection.
Where pigs or poultry rely on fans, welfare law expects a back-up for the ventilation and an alarm with its own power, so a failure is noticed even in a power cut.
HSE advice on electricity around the farm
The HSE asks for fixed machinery to have a switch that's easy to reach and clearly marked, and for fuses never to be bypassed or wrapped in foil. Tools used outdoors should run through an RCD, with somebody on the farm pressing its test button now and then.
Electricity can jump from an overhead line to a raised loader or a tipping trailer without touching it. If a machine does make contact, stay in the cab and call the network operator, and if fire forces you out, jump well clear so you never touch the machine and the ground together.
When to book farm electrical work
NFU Mutual's risk team suggests booking electrical testing in the quieter winter months, away from silage making. A farm that lambs indoors may prefer the autumn, and we'll book round whichever weeks you choose.
Other work on the farm
I also fit CCTV for a farmyard, with cameras watching the gate and the diesel tank, viewable from your phone.
Where broadband doesn't reach, a Starlink dish for the farm office goes on the roof or a pole with a clear view of the sky.
If you're thinking about solar panels on farm buildings, that work goes through our solar partner.
Converting a barn or old stables into a home or a holiday let is different again. Once people live there it stops being a farm building, and it's wired as a new dwelling.
Farms across the Wolds and Holderness
I'm based in Bridlington. Driffield and the Wolds are about 25 minutes away off-peak and Hornsea about 30. I work on farms further down into Holderness too, as far as Hedon and Withernsea, which take me about 65 minutes.
Farm inspection price
We price an inspection per building or per board, so a yard with several sheds is priced shed by shed. Whole-farm packages and new wiring have quotes of their own.
| Job | Price | Includes | Priced |
|---|---|---|---|
| Farm inspection, per building or boardOne agricultural building or distribution board, accessible, up to 12 circuits, Section 705 inspection and report | from £295 | Inspection and test · Section 705 report · Insurer-ready summary | per building or board |
Every price is a "from" price for a standard job, priced per job, never by the hour. Anything not on the list is quoted in writing after a free survey. Prices include travel to your address, and a merchant run if the job needs anything out of the ordinary: no travel charge on top. No VAT to add.
Book a free survey
How a farm job runs
-
Get in touch
Tell us roughly how many buildings and boards there are, and what the insurer has asked for.
-
Free survey
I walk the yard with you and note which board feeds which building.
-
A price for the farm
A written, fixed quote within two working days of the survey.
-
Inspection and sign-off
Certificate issued before the final invoice.
What we promise
- Certificate issued before the final invoice.
- A written, fixed quote within two working days of the survey.
- The same electrician from survey to sign-off.
- Work tested to BS 7671:2018+A4:2026.
- 24-month workmanship guarantee on top of your statutory rights.
- 12-month guarantee on the parts we supply, on top of your statutory rights; fittings you supply carry their maker's warranty.