Mon–Fri 08:00–17:00Out-of-hours attendance evenings, weekends and bank holidays, priced per attendance

Loft conversions · electrics and sign-off

Loft conversion electrics, tested and certified for Building Control.

Building Control won't sign off a loft conversion until the electrical work is shown to meet the regulations. I wire the new room at first and second fix. Once every circuit is tested, I issue the Electrical Installation Certificate for the sign-off.

  • £2m public liability insurance
  • Work carried out to BS 7671:2018+A4:2026
  • Fire alarm design, installation and commissioning to BS 5839-1

Loft conversion legal requirements and sign-off

Converting a loft is building work that needs approval from Building Control, either the council or a registered private approver, and the approval comes at the end as a completion certificate.

The electrical side is part of that. Adding circuits for the new room is notifiable work under Part P, so before the completion certificate is issued, the electrics have to be certified by one of the routes Approved Document P allows.

Members of a competent person scheme certify their own work, and the scheme tells Building Control. Without that, a registered third-party certifier is brought in to check the work, or Building Control hears about it before the job starts and inspects as much as it needs.

Every route ends with the work tested, and I write the results up on the Electrical Installation Certificate, which is included in the loft price.

When you sell, the Law Society's property information form asks about loft conversions and for their Building Regulations completion certificates, so keep the completion certificate with the Electrical Installation Certificate.

Fire safety checks at sign-off

A loft room is a new habitable room above the ground floor, so Approved Document B asks for a fire detection and alarm system. Building Control looks for it before the conversion is signed off.

Those alarms have to be mains-powered and interlinked, so one going off sets off the rest, which matters most to whoever is asleep at the top of the house. Interlinked smoke and heat alarms for a loft aren't in the loft price. I price them in the written quote.

Approved Document B also looks at the escape route from the new storey down through the house, which can mean fire-resisting doors on the stairs and landings. That part is building work for your builder.

Loft conversion first fix

First fix starts once the new floor is down and the stud walls are framed, and it's finished before the plasterboard goes up. The new circuits come up from the consumer unit, often through a cupboard or the stairwell, and run through the joists and studs to each socket, switch and light.

Lofts are full of insulation, and a cable buried in it can't lose heat the way a cable in open air can, so it carries less current safely. The cables are run clear of the insulation where possible, and a cable that has to pass through it is sized up to suit.

A light on the new stair that switches at the top and at the bottom saves anyone climbing up in the dark.

A shower room in the loft

If the loft includes an en-suite, the area around its shower or bath is one of Part P's special locations, and adding to or altering circuits there is notifiable work in its own right.

Lights and an extractor fan near the shower are chosen to suit that zone, and an electric shower gets its own circuit from the board.

Loft conversion bedroom lighting

Sloping ceilings change what works in a loft bedroom. A pendant can hang awkwardly under a slope, so wall lights, or a fitting on the flat part of the ceiling, often suit the room better.

Switches by the bed save getting up to put the main light off, and sockets want to go where the bed and a desk will actually stand.

Fittings and faceplates come at second fix, once the plaster is skimmed and the room decorated, and then each circuit is tested.

The consumer unit and the rest of the house

The loft price assumes the board you have has room for the new circuits and the right protection for them. If it hasn't, a new consumer unit is quoted separately, before any work starts.

Converting the loft doesn't mean rewiring the rest of the house. Under Approved Document P only the new work has to meet current standards, unless it would make the existing installation less safe or the existing wiring isn't fit to support it.

At the survey I check the earthing and bonding, and whether the supply can take the extra load.

Planning permission for a loft conversion

Planning and Building Regulations are separate questions. Many loft conversions are permitted development, so they need no planning application, but there are limits on the extra volume and the roof, and the right doesn't apply on protected land such as conservation areas and National Parks.

Prices

Loft conversion electrics price

The starting price for the loft wiring. The alarms go on the written quote.

Loft wiring price
JobPriceIncludesPriced
Loft conversion electricsElectrics for a loft conversion: first and second fix to the new room, existing board has capacity, tested and issued with an Electrical Installation Certificate for Building Control sign-off; smoke and heat alarms and any board upgrade quoted separatelyfrom £795First fix · Second fix · Testing · Electrical Installation Certificate for Building Controlper loft conversion

Every price is a "from" price for a standard job, priced per job, never by the hour. Anything not on the list is quoted in writing after a free survey. Prices include travel to your address, and a merchant run if the job needs anything out of the ordinary: no travel charge on top. No VAT to add.

Book a free surveyCertificate issued before the final invoice.

Book a free survey

Process

How a loft is wired

  1. Tell me about the loft

    Say whether there are drawings yet, and where the house is.

  2. Survey

    I see the loft space and check the board the new circuits will come from.

  3. Fixed price in writing

    A written, fixed quote within two working days of the survey.

  4. Tested and certified

    Certificate issued before the final invoice.

On every job

What we promise

  • Certificate issued before the final invoice.
  • A written, fixed quote within two working days of the survey.
  • The same electrician from survey to sign-off.
  • Work tested to BS 7671:2018+A4:2026.
  • 24-month workmanship guarantee on top of your statutory rights.
  • 12-month guarantee on the parts we supply, on top of your statutory rights; fittings you supply carry their maker's warranty.
Call Book a survey