EV chargers · home charge points
EV charger installation, supplied and fitted on its own circuit.
I supply a 7 kW smart charger and wire it on a new circuit straight from your consumer unit, protected against a broken earth in the supply cable. What changes the cost is mostly where the car parks. I fit chargers anywhere from Hull to Scarborough, working out of Bridlington.
- £2m public liability insurance
- Work carried out to BS 7671:2018+A4:2026
- Fire alarm design, installation and commissioning to BS 5839-1
What a home charger installation costs
The standard price is for a 7 kW smart charger on a dedicated circuit run up to 15 m from the board, fitted where no digging is needed.
A longer cable run puts the price up, and so does a trench across a drive or a lawn. If the board has no room for another circuit, a new consumer unit may have to go in first. Anything beyond the standard job is priced on the written quote before you decide.
Siting the charger and checking the supply
The charger has to sit where the charging lead reaches the car's port without stretching across a path, and clear of a bumper as the car pulls in. We agree the spot at the survey.
From the charger, the cable runs to the board along an outside wall, fixed where it won't get knocked, or under a floor and through the loft. The power goes off for a short while when it is connected at the board.
A charger working flat out draws nearly as much as an electric shower and keeps going for hours, while the network operator's main fuse limits what the whole house can take at once. Building regulations guidance says new work should only go on once the existing equipment can carry the extra load, including the meter and the network's cable into the house. I look at the main fuse rating and the meter first, and if the supply needs upgrading, the network operator does that work.
Where the supply is tight, some chargers can measure what everything else in the house is using and slow their charging to stay inside the limit.
At the board, the circuit needs an RCD of a suitable kind. A fault in the car or the charger can leak direct current, which can stop an ordinary RCD working, so the protection has to cope with that unless the charger has it built in.
Why home chargers have to be smart
Under the Electric Vehicles (Smart Charge Points) Regulations 2021, a charger sold for a home in Great Britain has to be a smart charger. It must be able to change when and how fast it charges in response to a signal, and keep charging if it loses its internet connection.
Out of the box it is set to charge outside the busiest hours, and you can change or remove that setting when you first use it. It also has a randomised delay, so the chargers in a street don't all start at the same moment, and it has to meet a security standard.
Earthing and PEN-fault protection
Many houses take their earth from the supply cable, an arrangement called PME, where one conductor in the cable serves as both neutral and earth. If that conductor breaks, metalwork connected to the house earth can rise to a dangerous voltage.
Outdoors the risk is greater, because whoever touches the car is standing on the ground. So the wiring regulations only allow a PME earth for an outdoor charge point with an extra measure in place, either an earth electrode or a device that disconnects the car when that fault happens. Some chargers have the device built in.
Which measure suits a house depends on its earthing and where the charger goes. Whichever it is, PEN-fault protection is in the standard price.
Charging without a rewire
A charger doesn't usually mean rewiring the house. It's fed by a new circuit from the consumer unit, leaving the existing wiring as it is. That circuit is sized to carry the full charging current for hours at a time, which is why a charger is never taken off a socket circuit.
Wiring behind the board that hasn't been tested in years is worth a condition report before anything new is added to it.
Choosing the charger
A 7 kW smart charger is the usual size for a house on a single-phase supply, and it's what the standard job uses. Chargers come tethered, with a cable fixed to the unit, or untethered, with a socket for the car's own cable, which then lives in the boot.
Some chargers can top the car up from solar panels while they are generating. Fitting the panels is a different job, covered under solar and battery installations.
Building regulations for a home charger
Adding a circuit for a charger is notifiable building work in England, the same as any new circuit in a home. Part S, the part of the Building Regulations written for charge points, is for new and converted homes and for major renovations, so a charger added to a house that is already lived in falls outside it.
I test the circuit and the charger before handing over, and you get an Electrical Installation Certificate with the results.
EV charger price
The charger comes with the job, so there's nothing to buy first.
| Job | Price | Includes | Priced |
|---|---|---|---|
| EV charger, supply and install7 kW smart charger, dedicated circuit up to 15 m from the board, PEN-fault protection, no groundworks | from £895 | Charger · Dedicated circuit · Testing · Certificate | per charger |
Every price is a "from" price for a standard job, priced per job, never by the hour. Anything not on the list is quoted in writing after a free survey. Prices include travel to your address, and a merchant run if the job needs anything out of the ordinary: no travel charge on top. No VAT to add.
Book a free survey
How a charger is fitted
-
Get in touch
Send the postcode and say where the car parks.
-
Free survey
Where the car parks sets the cable route, so I start there, then check the board and the earthing.
-
Quote for the charger
A written, fixed quote within two working days of the survey.
-
Installation day
Certificate issued before the final invoice.
What we promise
- Certificate issued before the final invoice.
- A written, fixed quote within two working days of the survey.
- The same electrician from survey to sign-off.
- Work tested to BS 7671:2018+A4:2026.
- 24-month workmanship guarantee on top of your statutory rights.
- 12-month guarantee on the parts we supply, on top of your statutory rights; fittings you supply carry their maker's warranty.