What I count as a small job
An old light fitting coming down and a new one going up on the same point is a small job. So is swapping a cracked socket, or replacing a bathroom fan where the old one was. I supply a standard fitting, so you don't need to buy one first.
One extra socket counts as well, when it can be taken from a circuit that's already close by. Up to three fittings, switches or sockets go at one price, so it pays to save the little jobs up and have them done together.
The extractor fan price is for a standard fan. Some cost a lot more to buy, so the price depends on the one you've picked. I still fit downlights, though few people ask for them now.
Testing after a swap
Even a straight swap is tested before I pack up. For a light that means checking the earth reaches the new fitting and the switch breaks the live conductor, so the fitting is dead when it is switched off.
Some older lighting circuits have no earth conductor at all. A metal fitting can't go on one, because a fault inside it would make the metal live with nothing to clear it. The choice then is an earth run to that point first, or a plastic fitting.
When a job needs a new circuit
Some things can't share a circuit that's already there and need one of their own, wired back to the consumer unit. A cooker or an electric shower draws too much current to share, and a car charger always gets a dedicated circuit.
Connecting a new cooker or hob to a cooker circuit that's already big enough is a small job. With no circuit, or one too small for the new cooker, a new circuit goes in first, and that counts as notifiable building work.
A new circuit also needs a spare way in the board, and the cooker circuit price assumes there is one. If the board is full, the consumer unit may need changing first.
Small jobs and the building regulations
Part P of the Building Regulations covers all electrical work in a home in England, including the garden and any shed or garage that runs off the house supply. Only some of that work is notifiable, which means Building Control has to be told.
A new circuit is notifiable. So is a replacement consumer unit, and so is any change to the wiring in the zone around a bath or shower.
Everything else is not notifiable. Swapping fittings, repairs and adding to a circuit away from the bath or shower need no notice, but the work still has to meet the wiring regulations, and the council can act on work that is unsafe.
Notifiable or not, I test what I've done and give you the paperwork. A new circuit gets an Electrical Installation Certificate, and an extra socket on an existing circuit comes with a minor works certificate where one is needed.
Kitchen and bathroom electrics
In a kitchen, an extra socket over the worktop is usually a small job, and a new cooker circuit has its own line in the table. When the whole kitchen is coming out, that's the time to rewire the kitchen, before the units and tiles go back.
Swapping a bathroom fan or light like for like isn't notifiable, but new wiring near the bath or shower is. Electric showers need their own circuit from the board, sized for the shower.
Sheds, garages and the garden
A garden shed or garage wired from the house falls under Part P too, because it shares the house supply. Its power goes out in armoured cable to a small board in the building.
Outside sockets and garden lights come round with the seasons, sockets in spring and lighting once the nights draw in. Both need weatherproof fittings and RCD protection.
A hot tub wired to the board is a circuit job as well, with an isolator near the tub, and its earthing needs more thought than a shed's.
Board changes and car chargers
Board changes are one of the jobs I'm asked for most. An old fuse box is not illegal, and one with rewireable fuses can still protect its circuits, so whether it needs replacing depends on what a condition report finds.
A home car charger also needs the house's earthing checked first, because the wiring regulations set extra rules for earthing a charge point outdoors.
When something stops working
A fault is different, because nobody knows what the job is until it has been traced. A fault-finding visit is priced separately and covers finding the fault and making it safe. Then I price the repair once I know the cause.
Small job prices
Four of these jobs work on wiring that's already in place. The cooker circuit is the exception, a new run from the board.
| Job | Price | Includes | Priced |
|---|---|---|---|
| Replace or add a socket or switchOne socket or switch replaced, or one additional socket spurred from an existing circuit, accessible run under 3 m | from £85 | Accessory · Testing · Minor works certificate where required | per job |
| Replace up to three light fittings, switches or socketsUp to three light fittings, switches or sockets swapped like for like on existing points and supplies, with standard fittings we supply; anything not on an existing supply is quoted | from £95 | Standard fittings supplied · Up to three items replaced · Testing | per job |
| Connect a cooker or hobConnect a customer-supplied cooker or hob to an existing, adequate cooker circuit | from £85 | Connection · Testing | per job |
| Replace a bathroom extractor fanLike-for-like replacement of a bathroom extractor fan on the existing supply, with a standard fan we supply; a dearer fan costs more, and a fan not on an existing supply is quoted | from £140 | Standard fan supplied · Fan replaced · Testing | per job |
| Cooker circuitDedicated cooker circuit up to 32 A, cooker switch, board has capacity | from £245 | Circuit · Cooker switch · Testing · Certificate | per circuit |
Every price is a "from" price for a standard job, priced per job, never by the hour. Anything not on the list is quoted in writing after a free survey. Prices include travel to your address, and a merchant run if the job needs anything out of the ordinary: no travel charge on top. No VAT to add.
How a small job is booked
-
Get in touch
Tell me what you'd like changed or added, and the postcode.
-
Free survey
Anything that isn't a straight swap on an existing supply, I look at first.
-
Quote for anything bigger
A written, fixed quote within two working days of the survey.
-
Fitted and tested
Certificate issued before the final invoice.
What we promise
- Certificate issued before the final invoice.
- A written, fixed quote within two working days of the survey.
- The same electrician from survey to sign-off.
- Work tested to BS 7671:2018+A4:2026.
- 24-month workmanship guarantee on top of your statutory rights.
- 12-month guarantee on the parts we supply, on top of your statutory rights; fittings you supply carry their maker's warranty.